Raiffeisen Bank, Savosa

1407
celoria Architects
Handel und Verwaltung
Neubau
Wettbewerb
Einladungsverfahren

This building has reached very high ecological and sustainable standards. It is the first administrative building certified SNBS Gold in Ticino, it has achieved Minergie P-Eco certification and is made entirely of recycled concrete.
The project changes the paradigm of the bank, which instead of being a closed envelope, opens up towards the public, configuring itself as a glazed volume, light and permeable, creating a dual relationship, with the city and the landscape. The square plan defines the 360° relationship and rests on eight oblique perimeter pillars that taper upwards. The floor plan is also reduced, supporting the vocation of leaning towards the sky. The floor plans are free, allowing for maximum flexibility of spaces. The project stands as the trigger and pivot of an act of urban regeneration of the area that reconfigures the circulation, freeing the northern part from traffic. The platform on which it rests will be extended in the future and will design the new town square.

Bildrechte: Giorgio Marafioti

Überlegungen zum Projektantrag

Sinnvoller Einsatz von Beton
The building is made entirely of in-situ recycled concrete. The storeys are square in shape, reducing towards the top. The vertical structure is given by a light framework of 8 perimeter pillars that taper as they rise, and by the central core. To keep the pillars and slabs very fine, there are prestressing cables inside the beams that run from pillar to pillar.
The overhang of the slabs is calibrated to optimise the sun contribution over the seasons and make the building even more sustainable.
Materialspezifische Innovationen
All materials used in the project are environmentally friendly and comply with the characteristics required by Minergie-P-ECO. The concrete is entirely recycled, meaning the aggregates in the concrete come from the demolition of previous constructions.
The sparing use of concrete, thanks to an exceptional structural concept, has made it possible to minimise the amount of grey energy derived from it, even with a building made of
concrete to achieve the highest ecological certifications.
Interdisziplinäre Ansätze
Constructing a 5-storey building in fair-faced recycled concrete is not easy, as it was made in several separate castings. The colour and characteristics of the concrete could vary greatly, depending on the mix, the weather conditions and the fact that the aggregates in the concrete could come from different demolitions and have very different characteristics and colour. With the engineer, we therefore opted to produce the concrete in a concrete batching plant that could control these aspects.
Ortsspezifische Gestaltung
The project is configured as a glass volume, light and permeable, which creates a dual relationship, with the city and with the landscape. At an urban level it reconfigures the circulation, freeing the entire northern part from traffic.
The platform on which it rests will be extended in the future and will design the new town square.
In the southern part, we created a cycle-pedestrian path in accordance with the Savosa town planning project, to promote cycle-pedestrian mobility.
Gestalterisch-räumliche Konzeption
The Raiffeisen bank no longer wants to be a closed shell, as it was in the past, but wants to be open to the public and welcome all people into its spaces.
For this reason, the ground floor is very transparent and permeable. People who are not customers can also access this floor to study or to meet.
On the upper floors there are different consulting areas with different degrees of privacy.
The work spaces are also designed to have quieter zones and other open spaces.
Durchdachtes Tragwerk
The structure of the building is optimised to the extreme, relying on eight perimeter pillars and a central core. This reduces grey energy and gives maximum flexibility to the spaces, which can change configuration and function, adapting to all possible future developments.
The ground floor is the exception, as it opens outwards and hosts the bank's reception area and the training room, which is designed to be able to function independently of the rest of the bank and be rented to external user.
Umfassende Nachhaltigkeit
This building is SNBS Gold and Minergie P-Eco certified. SNBS standard includes 3 spheres: environment, social and economic. These certifications were achieved thanks to high energy efficiency and the use of ecological materials that minimise grey energy content and the emission of pollutants, combined with the parsimonious use of recycled concrete thanks to an exceptional structural concept; the creation of an attractive working and meeting environment in comfort (thermal, acoustic and light).

Eigenschaften

Ort
Savosa, Lugano
Baukategorie (SIA 102)
Handel und Verwaltung
Art der Aufgabe
Neubau
Art des Verfahrens
Wettbewerb
Beschaffungsform
Einladungsverfahren
Baukosten in CHF (SIA 416)
20'500'000.-
Geschossfläche in m² (SIA 416)
5'900 mq
Planung
2018 → 2020
Fertigstellung
2021 → 2023
Inbetriebnahme
2023

Projektbeteiligte

Bauingenieurwesen
Baumanagement
Studio di architettura Micheli Stefano & Berta Aram
Akustikplanung
Projektleitung
Fassadenplanung
Wasserbau
Elektroplanung
Innenarchitektur